Climate resilience: reviewing highway drainage under changing rainfall

This Dicas de BIM post is part of a selection of standout papers from the proceedings of the 7th and 8th editions of the A ERA BIM International Congress, organized by @SINAENCO in 2024 and 2025, respectively. The article was published in the proceedings of the 8th edition, held November 25–27, 2025, in São Paulo, Brazil.
The paper was written by Thiago Melo, Amanda Oliveira, Heloísa Souza, Victor Porto, Heberson Dias, José Gomes, Juliana Silva.
The Civil 3D BIM model brought together data from the disciplines, helped identify critical drainage elevations and documented changes to the highway design.
In the analysis of Brazil’s BR-386 highway in Rio Grande do Sul documented in 2025, the TPF Engenharia team investigated whether historical rainfall assumptions remained suitable for designing road infrastructure under more extreme climate scenarios. The question mattered particularly for bridges and other major structures whose hydraulic performance depended on the flow rates assumed in the design.
Historical rainfall records spanned 1962 to 2025. The projections covered 2025 to 2100. The study combined projections from the CMIP6 climate model ensemble with a revision of rainfall intensity, duration, and frequency curves. The updated curves fed hydrological and hydraulic analyses used to estimate design flows and examine their effects on the infrastructure. The analysis also included an estimate of greenhouse gas emissions. Figure 1 shows the rainfall intensity, duration and frequency curves for Marginal Estrela.
Figure 1 — Rainfall intensity, duration and frequency curves for Marginal Estrela

Source: (Melo; Oliveira; Souza; Porto; Dias; Gomes; Silva, 2025). Image 1 in the proceedings, p. 79
Including emissions broadened the comparison between adaptation options. An intervention could be examined in terms of its response to revised flow estimates and the other effects considered by the authors. This brought together criteria that a review limited to hydraulic sizing would have kept separate.
Under the conditions examined, peak design flows increased by 10 to 20 percent. The authors said this called for considering structural and operational adaptations. BIM helped bring the data together and visualize them, connecting hydraulic performance to other decision criteria such as emissions and economic feasibility. Figure 2 shows the projected flood extent.
Figure 2 — Projected flood extent

Source: (Melo; Oliveira; Souza; Porto; Dias; Gomes; Silva, 2025). Image 7 in the proceedings, p. 81
The percentages applied to the stretch and assumptions examined. What could inform work on other highways was the analytical sequence: update rainfall assumptions, recalculate flows, and evaluate the consequences before selecting an intervention.
Read the paper in the free proceedings of the 8th A ERA BIM Congress (p. 73)
See the version of this article published on Zenodo
Want to learn how to structure a BIM model for road infrastructure and drainage in IFC? Explore EBBIM’s course “IFC – dos fundamentos à gestão de projetos e obras”.